Newly certified Manufacturers Certification criteria

No element found

Construction systems

Certified construction systems deliver Passive House standard U-values together with thermal bridge-free junctions, providing excellent levels of thermal protection along with freedom from condensation risk and mould growth - a critical factor for long-term durability and good indoor air quality. The certified product range spans multiple construction types, from simple EIFS (Exterior Insulation Finishing Systems) to lightweight timber and steel frame constructions, giving architects and designers a high degree of design and architectural freedom, without compromising on energy efficiency. Each system includes pre-engineered window connection details, ensuring high performance, even at the building envelope's most vulnerable junctions. At the core of every solution is high-performance insulation - a silent hero of Passive House design - working continuously to reduce heat loss, stabilize indoor temperatures, and support overall building energy efficiency.
Filtri
filter
0Products in the comparision list
Compare all
Cerca
CategoriaConstruction typeClimate zonesDate certified

Component

Manufacturers

Construction system Steel Freddo, temperato apr 2015
Construction system Solid (prefabricated) Caldo, temperato apr 2022
Construction system Light Freddo, temperato gen 2012
Roof system Steel Freddo, temperato nov 2020
Floor slab system Concrete formwork Freddo, temperato dic 2016
Construction system Light (wood) Freddo, temperato dic 2015
Wall system Concrete formwork Freddo, temperato gen 2022
Construction system Light (straw) Freddo, temperato gen 2016
Construction system Light (wood) Freddo, temperato apr 2015
Construction system Light (wood) Freddo, temperato dic 2015
Wall system Single leaf Freddo, temperato gen 2008
Construction system Solid (TICS) Freddo feb 2019
Construction system Solid Freddo, temperato apr 2016
Wall system Steel Caldo, temperato ott 2025
Construction system Light Freddo, temperato gen 2005
Construction system Light (wood) Freddo, temperato mar 2018
Construction system Light (wood) Freddo, temperato dic 2019
Floor slab system Concrete formwork Freddo apr 2020
Floor slab system Concrete formwork Freddo, temperato apr 2020
Floor slab system Concrete formwork Freddo, temperato apr 2020
Wall system Solid Freddo, temperato gen 2007
Floor slab system Concrete formwork Freddo, temperato dic 2015
Construction system Solid (prefabricated) Caldo, temperato set 2018
Floor slab system Concrete formwork Freddo, temperato gen 2004
Construction system Solid Freddo, temperato gen 1998
Construction system Concrete formwork Freddo, temperato dic 2016
Construction system Concrete formwork Freddo, temperato gen 2018
Floor slab system Concrete formwork Freddo, temperato gen 2009
Construction system Concrete formwork Freddo, temperato mar 2018
Floor slab system Concrete formwork Freddo, temperato lug 2016
Wall system Solid Freddo, temperato giu 2015
Construction system Light Freddo, temperato gen 2010
Construction system Light Freddo, temperato gen 2005
Construction system Steel Freddo, temperato ott 2019
Construction system Light Freddo, temperato gen 2013
Construction system Light (wood) Freddo, temperato ott 2025
Construction system Light (wood) Freddo, temperato giu 2016
Construction system Light (wood) Freddo, temperato giu 2016
Construction system Light (wood) Freddo, temperato mar 2015
Construction system Light (wood) Freddo, temperato mar 2026
Construction system Light (wood) Freddo, temperato mar 2026
Construction system Solid (prefabricated) Freddo, temperato set 2014
Construction system Light (wood) Caldo, temperato nov 2017
Roof system Solid (TICS) Freddo, temperato lug 2019
Roof system Solid (TICS) Caldo, temperato lug 2019
Construction system Light (wood) Freddo, temperato nov 2025
Construction system Light (wood) Freddo, temperato feb 2023
Construction system Steel Caldo, temperato set 2018
Construction system Light (wood) Freddo, temperato dic 2023
Wall system Solid Freddo, temperato gen 2008
Floor slab system Concrete formwork Freddo, temperato gen 2009
Wall system Light (wood) Freddo apr 2020
Wall system Light (wood) Freddo apr 2020
Wall system Light (wood) Freddo, temperato apr 2020
Wall system Light (wood) Freddo, temperato apr 2020
Floor slab system Concrete formwork Freddo, temperato gen 2012
Construction system Light (wood) Freddo, temperato gen 2012
Wall system Solid (TICS) Freddo, temperato ago 2015
Construction system Solid (TICS) Freddo, temperato dic 2015
Construction system Solid (wood) Freddo apr 2017
Construction system Light (wood) Freddo, temperato dic 2015
Construction system Light (wood) Caldo, temperato mag 2022
Construction system Solid (wood) Freddo, temperato dic 2015
Construction system Light (wood) Freddo, temperato gen 2013
Construction system Light (straw) Freddo, temperato mar 2022
Construction system Solid Caldo, temperato giu 2024
Roof system Solid (TICS) Caldo, temperato lug 2020
Construction system Solid Caldo, temperato giu 2024
Construction system Solid Caldo, temperato giu 2024
Construction system Light (wood) Freddo, temperato gen 2018
Construction system Light (wood) Freddo, temperato lug 2021
Wall system Light (wood) Freddo ott 2020
Construction system Light (wood) Caldo, temperato set 2020
Construction system Light (wood) Caldo, temperato set 2020
Construction system Single leaf Freddo, temperato giu 2018
Roof system Solid (TICS) Caldo, temperato feb 2025
Construction system Light Caldo, temperato dic 2025
Construction system Solid Freddo, temperato gen 2010
Construction system Solid Freddo, temperato gen 2007
Construction system Light (wood) Freddo ago 2021
Construction system Solid (TICS) Caldo, temperato lug 2024
Back to top