Newly certified Manufacturers Certification criteria

No element found

Construction systems

Certified construction systems deliver Passive House standard U-values together with thermal bridge-free junctions, providing excellent levels of thermal protection along with freedom from condensation risk and mould growth - a critical factor for long-term durability and good indoor air quality. The certified product range spans multiple construction types, from simple EIFS (Exterior Insulation Finishing Systems) to lightweight timber and steel frame constructions, giving architects and designers a high degree of design and architectural freedom, without compromising on energy efficiency. Each system includes pre-engineered window connection details, ensuring high performance, even at the building envelope's most vulnerable junctions. At the core of every solution is high-performance insulation - a silent hero of Passive House design - working continuously to reduce heat loss, stabilize indoor temperatures, and support overall building energy efficiency.

Filtreler
filter
0Products in the comparision list
Compare all
Ara
CategoryConstruction typeClimate zonesDate certified

Component

Manufacturers

Construction system Steel Cool, temperate avril 2015
Construction system Solid (prefabricated) Warm, temperate avril 2022
Construction system Light Cool, temperate janv. 2012
Roof system Steel Cool, temperate nov. 2020
Floor slab system Concrete formwork Cool, temperate déc. 2016
Construction system Light (wood) Cool, temperate déc. 2015
Wall system Concrete formwork Cool, temperate janv. 2022
Construction system Light (straw) Cool, temperate janv. 2016
Construction system Light (wood) Cool, temperate avril 2015
Construction system Light (wood) Cool, temperate déc. 2015
Wall system Single leaf Cool, temperate janv. 2008
Construction system Solid (TICS) Cold févr. 2019
Construction system Solid Cool, temperate avril 2016
Wall system Steel Warm, temperate oct. 2025
Construction system Light Cool, temperate janv. 2005
Construction system Light (wood) Cool, temperate mars 2018
Construction system Light (wood) Cool, temperate déc. 2019
Floor slab system Concrete formwork Cold avril 2020
Floor slab system Concrete formwork Cool, temperate avril 2020
Floor slab system Concrete formwork Cool, temperate avril 2020
Wall system Solid Cool, temperate janv. 2007
Floor slab system Concrete formwork Cool, temperate déc. 2015
Construction system Solid (prefabricated) Warm, temperate sept. 2018
Floor slab system Concrete formwork Cool, temperate janv. 2004
Construction system Solid Cool, temperate janv. 1998
Construction system Concrete formwork Cool, temperate déc. 2016
Construction system Concrete formwork Cool, temperate janv. 2018
Floor slab system Concrete formwork Cool, temperate janv. 2009
Construction system Concrete formwork Cool, temperate mars 2018
Floor slab system Concrete formwork Cool, temperate juil. 2016
Wall system Solid Cool, temperate juin 2015
Construction system Light Cool, temperate janv. 2010
Construction system Light Cool, temperate janv. 2005
Construction system Steel Cool, temperate oct. 2019
Construction system Light Cool, temperate janv. 2013
Construction system Light (wood) Cool, temperate oct. 2025
Construction system Light (wood) Cool, temperate juin 2016
Construction system Light (wood) Cool, temperate juin 2016
Construction system Light (wood) Cool, temperate mars 2015
Construction system Light (wood) Cool, temperate mars 2026
Construction system Light (wood) Cool, temperate mars 2026
Construction system Solid (prefabricated) Cool, temperate sept. 2014
Construction system Light (wood) Warm, temperate nov. 2017
Roof system Solid (TICS) Cool, temperate juil. 2019
Roof system Solid (TICS) Warm, temperate juil. 2019
Construction system Light (wood) Cool, temperate nov. 2025
Construction system Light (wood) Cool, temperate févr. 2023
Construction system Steel Warm, temperate sept. 2018
Construction system Light (wood) Cool, temperate déc. 2023
Wall system Solid Cool, temperate janv. 2008
Floor slab system Concrete formwork Cool, temperate janv. 2009
Wall system Light (wood) Cold avril 2020
Wall system Light (wood) Cold avril 2020
Wall system Light (wood) Cool, temperate avril 2020
Wall system Light (wood) Cool, temperate avril 2020
Floor slab system Concrete formwork Cool, temperate janv. 2012
Construction system Light (wood) Cool, temperate janv. 2012
Wall system Solid (TICS) Cool, temperate août 2015
Construction system Solid (TICS) Cool, temperate déc. 2015
Construction system Solid (wood) Cold avril 2017
Construction system Light (wood) Cool, temperate déc. 2015
Construction system Light (wood) Warm, temperate mai 2022
Construction system Solid (wood) Cool, temperate déc. 2015
Construction system Light (wood) Cool, temperate janv. 2013
Construction system Light (straw) Cool, temperate mars 2022
Construction system Solid Warm, temperate juin 2024
Roof system Solid (TICS) Warm, temperate juil. 2020
Construction system Solid Warm, temperate juin 2024
Construction system Solid Warm, temperate juin 2024
Construction system Light (wood) Cool, temperate janv. 2018
Construction system Light (wood) Cool, temperate juil. 2021
Wall system Light (wood) Cold oct. 2020
Construction system Light (wood) Warm, temperate sept. 2020
Construction system Light (wood) Warm, temperate sept. 2020
Construction system Single leaf Cool, temperate juin 2018
Roof system Solid (TICS) Warm, temperate févr. 2025
Construction system Light Warm, temperate déc. 2025
Construction system Solid Cool, temperate janv. 2010
Construction system Solid Cool, temperate janv. 2007
Construction system Light (wood) Cold août 2021
Construction system Solid (TICS) Warm, temperate juil. 2024
Back to top