Newly certified Manufacturers Certification criteria

No element found

Construction systems

Certified construction systems deliver Passive House standard U-values together with thermal bridge-free junctions, providing excellent levels of thermal protection along with freedom from condensation risk and mould growth - a critical factor for long-term durability and good indoor air quality. The certified product range spans multiple construction types, from simple EIFS (Exterior Insulation Finishing Systems) to lightweight timber and steel frame constructions, giving architects and designers a high degree of design and architectural freedom, without compromising on energy efficiency. Each system includes pre-engineered window connection details, ensuring high performance, even at the building envelope's most vulnerable junctions. At the core of every solution is high-performance insulation - a silent hero of Passive House design - working continuously to reduce heat loss, stabilize indoor temperatures, and support overall building energy efficiency.
Filtreler
filter
0Products in the comparision list
Compare all
Ara
CategoryConstruction typeClimate zonesDate certified

Component

Manufacturers

Construction system Steel Cool, temperate kwi 2015
Construction system Solid (prefabricated) Warm, temperate kwi 2022
Construction system Light Cool, temperate sty 2012
Roof system Steel Cool, temperate lis 2020
Floor slab system Concrete formwork Cool, temperate gru 2016
Construction system Light (wood) Cool, temperate gru 2015
Wall system Concrete formwork Cool, temperate sty 2022
Construction system Light (straw) Cool, temperate sty 2016
Construction system Light (wood) Cool, temperate kwi 2015
Construction system Light (wood) Cool, temperate gru 2015
Wall system Single leaf Cool, temperate sty 2008
Construction system Solid (TICS) Cold lut 2019
Construction system Solid Cool, temperate kwi 2016
Wall system Steel Warm, temperate paź 2025
Construction system Light Cool, temperate sty 2005
Construction system Light (wood) Cool, temperate mar 2018
Construction system Light (wood) Cool, temperate gru 2019
Floor slab system Concrete formwork Cold kwi 2020
Floor slab system Concrete formwork Cool, temperate kwi 2020
Floor slab system Concrete formwork Cool, temperate kwi 2020
Wall system Solid Cool, temperate sty 2007
Floor slab system Concrete formwork Cool, temperate gru 2015
Construction system Solid (prefabricated) Warm, temperate wrz 2018
Floor slab system Concrete formwork Cool, temperate sty 2004
Construction system Solid Cool, temperate sty 1998
Construction system Concrete formwork Cool, temperate gru 2016
Construction system Concrete formwork Cool, temperate sty 2018
Floor slab system Concrete formwork Cool, temperate sty 2009
Construction system Concrete formwork Cool, temperate mar 2018
Floor slab system Concrete formwork Cool, temperate lip 2016
Wall system Solid Cool, temperate cze 2015
Construction system Light Cool, temperate sty 2010
Construction system Light Cool, temperate sty 2005
Construction system Steel Cool, temperate paź 2019
Construction system Light Cool, temperate sty 2013
Construction system Light (wood) Cool, temperate paź 2025
Construction system Light (wood) Cool, temperate cze 2016
Construction system Light (wood) Cool, temperate cze 2016
Construction system Light (wood) Cool, temperate mar 2015
Construction system Light (wood) Cool, temperate mar 2026
Construction system Light (wood) Cool, temperate mar 2026
Construction system Solid (prefabricated) Cool, temperate wrz 2014
Construction system Light (wood) Warm, temperate lis 2017
Roof system Solid (TICS) Cool, temperate lip 2019
Roof system Solid (TICS) Warm, temperate lip 2019
Construction system Light (wood) Cool, temperate lis 2025
Construction system Light (wood) Cool, temperate lut 2023
Construction system Steel Warm, temperate wrz 2018
Construction system Light (wood) Cool, temperate gru 2023
Wall system Solid Cool, temperate sty 2008
Floor slab system Concrete formwork Cool, temperate sty 2009
Wall system Light (wood) Cold kwi 2020
Wall system Light (wood) Cold kwi 2020
Wall system Light (wood) Cool, temperate kwi 2020
Wall system Light (wood) Cool, temperate kwi 2020
Floor slab system Concrete formwork Cool, temperate sty 2012
Construction system Light (wood) Cool, temperate sty 2012
Wall system Solid (TICS) Cool, temperate sie 2015
Construction system Solid (TICS) Cool, temperate gru 2015
Construction system Solid (wood) Cold kwi 2017
Construction system Light (wood) Cool, temperate gru 2015
Construction system Light (wood) Warm, temperate maj 2022
Construction system Solid (wood) Cool, temperate gru 2015
Construction system Light (wood) Cool, temperate sty 2013
Construction system Light (straw) Cool, temperate mar 2022
Construction system Solid Warm, temperate cze 2024
Roof system Solid (TICS) Warm, temperate lip 2020
Construction system Solid Warm, temperate cze 2024
Construction system Solid Warm, temperate cze 2024
Construction system Light (wood) Cool, temperate sty 2018
Construction system Light (wood) Cool, temperate lip 2021
Wall system Light (wood) Cold paź 2020
Construction system Light (wood) Warm, temperate wrz 2020
Construction system Light (wood) Warm, temperate wrz 2020
Construction system Single leaf Cool, temperate cze 2018
Roof system Solid (TICS) Warm, temperate lut 2025
Construction system Light Warm, temperate gru 2025
Construction system Solid Cool, temperate sty 2010
Construction system Solid Cool, temperate sty 2007
Construction system Light (wood) Cold sie 2021
Construction system Solid (TICS) Warm, temperate lip 2024
Back to top